2016 Projects
Hazel Dell Road Improvement
Project Limits: Mileposts 0.02 to 1.15
Federal Classification: Rural Major Collector (07)
Project Description: Reconstruct roadway to include two 12-foot wide travel lanes with widened shoulders. Includes horizontal/vertical alignment improvements.
Basis for Project: Narrow roadway with little shoulder room. Poor visibility due to horizontal/vertical alignment.
Funding: Project funding includes $0 Federal Grants, $0 State Grants, and $200,000 County Funds for a total of $200,000.
Schedule: Construction is expected to occur in 2016.
Contact: Chris Andrews, Project Manager / Engineer, (360) 577-3030
___________________________________________________________________________
Tower Road Bridge Scour Repair
Project Limits: Milepost 2.90
Federal Classification: Rural Major Collector (07)
Project Description: Repair scour affecting north bridge abutment.
Basis for Project: Existing scour has potential to affect the stability of bridge abutment.
Funding: Project funding includes $563,000 Federal Grants, $0 State Grants, and $0 County Funds for a total of $563,000.
Schedule: Construction is expected to occur in 2016.
Contact: Chris Andrews, Project Manager / Engineer, (360) 577-3030
___________________________________________________________________________
Westside Highway Overlay - Phase 2
Project Limits: Mileposts 4.23 to 8.33
Federal Classification: Rural Major Collector (07)
Project Description: Grind and resurface deteriorating pavement surfaces on Westside Highway. Widen shoulders where feasible.
Basis for Project: Pavement on this segment of Westside Highway is rutted and deteriorating.
Funding: Project funding includes $0 Federal Grants, $0 State Grants, and $1,227,000 County Funds for a total of $1,227,000.
Schedule: Construction is expected to occur in 2016.
Contact: Roger Maurer, Project Manager / Engineer, (360) 577-3030
______________________________________________________________
Pacific Way Slide Repair
Project Limits: Mileposts 4.43 to 4.45
Federal Classification: Urban Minor Arterial (16)
Project Description: Repair and stabilize landslide affecting the roadway.
Basis for Project: Earth movement is damaging the eastbound lane with the potential for movement of the entire roadway.
Funding: Project funding includes $244,000 Federal Grants, $0 State Grants, and $38,000 County Funds for a total of $282,000.
Schedule: Construction is expected to occur in 2016.
Contact: Roger Maurer, Project Manager / Engineer, (360) 577-3030
South Cloverdale Road/Martin's Bluff Road
Intersection Improvement
Project Limits: South Cloverdale Road Mileposts 1.60 to 1.70; Martins Bluff Road Mileposts 1.30 to 1.39
Federal Classification: Rural Minor Collector (07)
Project Description: Revise intersection to create a new "T" intersection and eliminate potential conflicts.
Basis for Project: Multiple "yield" movements in current intersection configuration are confusing to motorists.
Funding: Project funding includes $79,500 Federal Grants, $0 State Grants, and $500 County Funds for a total of $80,000.
Schedule: Construction is expected to occur in 2016.
Contact: Chris Andrews, Project Manager / Engineer, (360) 577-3030