2015 Projects
Hazel Dell Road Improvement
Project Limits: Mileposts 0.15 to 1.15
Federal Classification: Rural Major Collector (07)
Project Description: Reconstruct roadway to include two 12-foot wide travel lanes with widened shoulders. Includes horizontal/vertical alignment improvements.
Basis for Project: : Narrow roadway with little shoulder room. Poor visibility due to horizontal/vertical alignment.
Funding:Project funding includes $1,006,000 Federal grants, $577,000 State Funds and $1,917,000,
County funds for a total of $3,500,000.
Schedule: Construction is expected to occur in 2015.
Contact: Chris Andrews, Project Manager / Engineer, (360) 577-3030
Kalama River Road Slide Repair
Project Limits: Milepost 9.16
Federal Classification: Rural Major Collector (07)
Project Description: Repair and stabilize existing landslide.
Basis for Project: A section of roadway moved during the 2009 flood events. Although the original FEMA application was denied, subsequent appeals were granted.
Funding:Project funding includes $318,000 Federal grants and $56,000 County funds for a total of $374,000.
Schedule: Construction is expected to occur in 2015.
Contact: Chris Andrews, Project Manager / Engineer, (360) 577-3030
South Silver Lake Road
Project Limits: Mileposts 4.90 to 5.20
Federal Classification: Rural Minor Collector (08)
Project Description: Widen and realign roadway's existing sharp curves.
Basis for Project: Narrow, winding roadway is not wide enough for truck traffic.
Funding: Project funding is provided by $500,000 of County funds.
Schedule: Construction is expected to occur in 2015.
Contact: Chris Andrews, Project Manager / Engineer, (360) 577-3030
Coal Creek Road and Hackett Road Washout Repairs
Project Limits: Coal Creek Road Mileposts 5.36 to 5.40 and Hackett Road Mileposts 0.78 to 0.80
Federal Classification: Rural Local Access (09)
Project Description: Repair existing roadway embankment and shoulder by placing new rock fill.
Basis for Project: In January 2009 washouts eroded the roadway embankments with damage extending into the shoulders.
Funding: Project funding includes $63,000 Federal grants and $9,000
County funds for a total of $72,000.
Schedule: Construction is expected to occur in 2015.
Contact: Roger Maurer, Project Manager / Engineer, (360) 577-3030