Excavation, removal of existing concrete block wall, construction of drilled shafts with steel soldier piles in concrete, installation of precast concrete lagging and subsurface drains, installation of tie-back anchors, roadway reconstruction, installation of beam guardrail, installation and maintenance of temporary traffic signals, and associated work.
|