Sign up to receive a text message or email when new bids are added!
Bid Title: Allender Road Stillwater Creek Fish Passage Project
Category: Public Works
Status: Closed

Description:

The work to be performed by the consultant consists of preparing civil, structural, geotechnical and

environmental engineering design and permitting for replacement of the Allender Road Culvert

between milepost 0.31 and milepost 0.41. The proposed project includes replacing the existing

concrete double box culvert with a new bridge that is 28 feet wide and spans Stillwater Creek.

Included in the project will be bank/habitat restoration of Stillwater Creek in the vicinity of the bridge

and reconstruction of the road approaches to the bridge. The County will provide the topographic

survey, boilerplate specifications, and pavement section. The County will be responsible for

developing right of way plans, obtaining appraisals and negotiating for easement acquisition and for

project bidding and award.





Publication Date/Time:
10/25/2021 11:00 am
Closing Date/Time:
11/4/2021 2:00 pm
Related Documents:

Return To Main Bid Postings Page