Temporary traffic control, erosion control and water pollution prevention, clearing and grubbing, shoring, roadway excavation and structural fill, installation of storm drain pipe, culverts and inlets, removal of culverts and concrete box culvert, installation of steel structural plate arch culvert and three sided concrete box culvert and concrete footings, wingwalls and headwalls, temporary stream diversion, stream reconstruction, temporary water main, new water main and services, planing pavement, roadway paving, guardrail and associated work.
|