Clearing and grubbing, installation of temporary stream diversion, shoring, excavation, removal of existing concrete box culvert, steel pile driving, reinforced concrete pile caps and wingwalls, installation of a 55-foot span steel structural plate arch culvert, roadway reconstruction, streambed reconstruction, installation of salvaged logs, seeding and mulching, plantings, and associated work.
|