2018 Projects

Rose Valley Road Embankment RepairSouth Pekin.jpg

Project Limits:  Milepost 0.21 to 0.34

Federal Classification: Rural Major Collector (07)

Project Description: Stabilize the embankment in the vicinity of existing washout.

Basis for Project
: During the December 2015 storm event water washed over the roadway and the embankment severely eroding the embankment and creating a steep slope that without stabilization will undermine the roadway.

Funding: Project funding includes $2227,400 Federal Grant, $0 State Grant and $52,600 County Funds for a total of $280,000.

Schedule: Construction is expected to occur in 2018.

Contact: Roger Maurer, Project Manager / Engineer (360) 577 - 3030

________________________________________________________________________________________________

Little Kalama River Road Drainage Improvement

Project Limits:  Milepost 6.77Little Kalalma River Rd.jpg

Federal Classification:  Rural Minor Collector (08)

Project Description:  Replace 32” by 60” squash pipe culvert with a 12’ concrete “bottomless” culvert.  The new culvert will allow for improved fish passage and prevent future clogging.  The project is at 90% design and is permitted.
 
Basis for Project:  Existing cross-culvert is undersized and failing.

Funding: Project funding includes $476,300 Federal Grants, $79,400 State Grants and $84,300 County Funds for a total of $640,000.

Schedule: Construction is expected to occur in 2018.

Contact: Roger Maurer, Project Manage / Engineer, (360) 577 – 3030.

________________________________________________________________________________________________

 
Bodine Road Slide Repair 

Project Limits: Milepost 2.01 to 2.04Goble Creek.jpg
 
Federal Classification: Rural Local Access (09)

Project Description
Relocate section of road to avoid existing landslide area.

Basis for Project: Earth movement is damaging the roadway shoulder with the potential for movement of the entire roadway.

Funding
:  Project funding includes $180,000 Federal Grants, $30,000 State Grants and $42,000 County Funds for a total of $252,000.

Schedule: Construction is expected to occur in 2018.

Contact:
Roger Maurer, Project Manager / Engineer, (360) 577 – 3030.

___________________________________________________________________________
___________________


Rose Valley Road Retaining Wall

Goble Creek.jpg

Project Limits:  Milepost 0.45 to 0.46

Federal Classification:  Rural Major Collector (07)

Project Description:  Replaced the existing retaining wall.

Basis for Project:  High flows during the December 2015 storm event scoured out material within and beneath the existing crib wall.

Funding: Project funding includes $0 Federal Grants, $0 State Grants, and $321,000 County Funds for a total of $321,000.

Schedule: Construction is expected to occur in 2018.

Contact: Roger Maurer, Project Manager / Engineer, (360) 577 -3030.



_______________________________________________________________________________________


Dike Road Reconstruction

Project Limits: Milepost 1.7 to 3.05Goble Creek.jpg

Federal Classification: Rural Local Access (09)

Project Description:  Reconstruct the roadway section to improve the structural strength of the roadway

Basis for Project:  Increased truck traffic has caused severe damage to the roadway because this roadway does not have an adequate roadway section to support frequent fully loaded trucks.

Funding: Project funding includes $0 Federal Grants, $0 State Grants, and $1,000,000 County Funds for a total of $1,000,000.

Schedule: Construction is expected in 2018.

Contact: Roger Maurer, Project Manager / Engineer, (360) 577 – 3030.

 