Bid Title: TOWER ROAD BRIDGE SCOUR REPAIR PROJECT
Category: Public Works
Status: Closed

Description:
Construction of in-water bridge footing repair for scour consisting of dewatering of a portion of the Toutle River, excavation, anchor drilling and installation, and CIP concrete.  Included in the work is shotcrete slope stabilization wall consisting of excavation, anchor drilling and installation, drainage backing, and shotcrete facing.
Publication Date/Time:
5/24/2016 12:00 pm
Closing Date/Time:
6/14/2016 11:00 am
Submittal Information:
www.bxwa.com (Please note that it may take 24-48 hours for this site to be updated)